Today is the hardest day I have been working for my present job.
My site has been ordered 69 pieces of blankets for replacing old ones and the blankets is used on ground floor lobby for prevent slippery of our valuable tenants when it is raining or rainstorm, even it is drizzling.
The blankets consists of different sizes, from the smallest 1.2metre*3.5metre to the largest 1.8metre*6metre. The biggest quantities are the size 1.2metre*6metre and 1.2metre*4.5metre. They consist over 70% of total blankets.
I think the weight of the smallest size of the blanket is around 6kg and the biggest size shall be over 18kg.
We need to unpack all new blankets and spreadout out on the floor and layer upon layer for the same size of blankets and then fold them soasto mark the specific identity for each blanket.
We have 5 manpower in this order, including the biggest morning shift IC. He instructs us to complete the mission. He is hardworking, every step he shows the step to us and help us to work
We move the blanks, unpacking the blankets, spread out the blankets, fold layer upon layer the blankets and mark down the identities for all blankets.
We all try out most effort and energies to have completed the task, including our IC by only 2 hours. Crazy and incredible time consuming.
But when we complete, it is the time to off duty. I don't have enough time to relax my hurry mood. This is the point I disappointed to my IC. He should arrange 3 hours instead of 2 hours to have finished the task and we can follow the task slowly and in relaxed mood.
Hope it will be better next time, I treasure.
(15/7 : I think carpet is more suitatble than blanket)